Cambridge University –

Materials Science & Metallurgy Building

Customer: MITIE Engineering Services
Consultant: Hoare Lea
BMS System Installed: Trend
Interfaces: Modbus metering
Value of Contract: £ 775,000
Completion: December 2013

Comments: 10 Form Four construction MCC’s serving mechanical plant in Basement, Roof and Floor plant areas. Natural ventilation control over the floors with chilled beams, FCU’s and forced ventilation units within internal offices and labs all with local user control and close control tolerances and linked into the existing campus 963 supervisor.


Quotient, Cardiff

Customer: Scientific Lesser
Consultant: Design and Build
BMS System Installed: Trend
Interfaces: None
Value of Contract: £250,000
Completion: January 2012

Comments: Full BMS system for main plant room and labs, reporting to control supervisor.



Vertex Pharmaceutical

Customer: Scientific Lesser
Consultant: Design and Build
BMS System Installed: Trend
Interfaces: None
Value of Contract: £200,000
Completion: June 2013

Comments: Central building management system for all main plant reporting to head end supervisor.



MSD Cramlington

Customer:Bailey Gomm
Consultant: Bailey Gomm
BMS System Installed: Satchwell BAS (Not engineered by T.f.Tull)
Interfaces: None
Value of Contract: Range from £80,000 - £200,000
Completion: Various

Comments: Full form four MCC’s throughout a number of plant rooms with integrated BAS systems and commissioning.